A truck mixer’s day is not spent only on the road. Between the loading queue at the plant, pump preparation and its turn to pour, the vehicle waits for long periods. For most of this time the drum must keep turning, and on a conventional truck mixer the diesel engine runs to turn it.
The hidden cost of idling
The power the drum needs is small compared with what the truck engine can deliver, so on site the engine runs for long periods at low efficiency. This increases fuel use, adds engine hours and shortens maintenance intervals. Exhaust and engine noise are also felt directly in nearby homes and workplaces.
Cities are setting rules
Many European cities are introducing noise and emission rules for construction sites, and some require zero-emission machinery in public tenders. Being able to work quietly in sensitive situations, such as night pours or work near hospitals and schools, gives concrete companies an advantage in tenders.
The contribution of electric drum drives
When the drum turns on electricity, the vehicle can wait on site with its engine off. This is one of the main goals of our electric conversion work at the Ulmet Technology Center: turning the drum during waiting time on site without running the diesel engine. We will share the expected reduction in noise and fuel use after measuring it in our own tests.
Source: Business Norway



